Step 03
Paint Booth Requirements
Paint Booth Application
Vehicle Information
Maximum Vehicle Dimensions
Rail Vehicle Information
Maximum Rail Vehicle Dimensions
Industrial Workpiece Information
Maximum Workpiece Dimensions
Workpiece Information
Maximum Workpiece Dimensions
Product Entry / Loading
Material Handling & Crane
Roof Configuration
Operator Access & Working at Height
Please indicate whether elevated operator access is required for painting,
inspection or other work around the product.
Desired Internal Booth Dimensions
Optional. Leave blank if you would like ColoX Industrie GmbH to recommend suitable booth dimensions.
Available Installation Space
Main Access Door
Booth Inlet / Floor Configuration
Painting Process
Step 03
Wet Painting / Liquid Coating Line Requirements
1. Available Factory Space
2. Workpiece Information
Minimum Workpiece Dimensions
Maximum Workpiece Dimensions
3. Production Capacity
4. Conveyor / Material Handling
5. Pretreatment / Cleaning
6. Liquid Paint Information
Paint TDS / SDS documents can be uploaded in the project documents section below.
7. Colours & Colour Changes
8. Paint Application
9. Coating Layers
10. Paint Booth & Overspray Collection
11. Flash-Off
12. Drying / Curing Oven
13. Coating Quality Requirements
14. Available Utilities
15. Installation Conditions
16. Scope & Customer-Supplied Equipment
Unless otherwise specifically agreed in the ColoX Industrie GmbH quotation,
site works and local services such as main electrical supply, gas supply and
local gas installation up to the designated equipment connection point,
external exhaust ducting / chimney, roof or wall penetrations, civil works,
foundations, concrete works, pits, floor or building modifications, and
utility routing and connections up to the designated connection points are
to be arranged by the customer in accordance with local regulations and
project requirements.
ColoX Industrie GmbH will provide the relevant technical requirements and
designated connection points for the supplied equipment. Any different
scope can be reviewed and agreed separately during the quotation stage.
17. Additional Requirements
Step 03
Powder Coating Line Requirements
1. Available Factory Space
2. Workpiece Information
Minimum Workpiece Dimensions
Maximum Workpiece Dimensions
3. Production Capacity
4. Conveyor / Material Handling
5. Pretreatment / Washing
6. Drying After Pretreatment
7. Powder Material
8. Colours & Colour Changes
9. Powder Application
10. Powder Booth & Recovery
11. Curing Oven
12. Coating Quality Requirements
13. Available Utilities
14. Installation Conditions
15. Scope & Customer-Supplied Equipment
Unless otherwise specifically agreed in the ColoX Industrie GmbH quotation,
site works and local services such as main electrical supply, gas supply and
local gas installation up to the designated equipment connection point,
external exhaust ducting / chimney, roof or wall penetrations, civil works,
foundations, concrete works, pits, floor or building modifications, and
utility routing and connections up to the designated connection points are
to be arranged by the customer in accordance with local regulations and
project requirements.
ColoX Industrie GmbH will provide the relevant technical requirements and
designated connection points for the supplied equipment. Any different
scope can be reviewed and agreed separately during the quotation stage.
16. Technical Documents
Powder TDS / SDS and other technical documents can be uploaded below.
17. Additional Requirements
Step 03
Washing / Pretreatment System Requirements
1. Available Factory Space
2. Workpiece Information
Minimum Workpiece Dimensions
Maximum Workpiece Dimensions
3. Incoming Contamination
4. Production Capacity
5. Material Handling / Conveyor
6. Pretreatment Method
7. Required Process Stages
8. Chemical Information
Chemical TDS / SDS documents can be uploaded in the project documents section below.
9. Water Quality
10. Tank / Bath Requirements
11. Process Heating
12. Drying
13. Wastewater / Water Management
14. Exhaust / Ventilation
15. Final Coating / Quality Requirements
16. Available Utilities
17. Installation Conditions
18. Scope & Customer-Supplied Equipment
Unless otherwise specifically agreed in the ColoX Industrie GmbH quotation,
site works and local services such as main electrical supply, gas supply and
local gas installation up to the designated equipment connection point,
external exhaust ducting / chimney, roof or wall penetrations, civil works,
foundations, concrete works, pits, floor or building modifications, and
utility routing and connections up to the designated connection points are
to be arranged by the customer in accordance with local regulations and
project requirements.
ColoX Industrie GmbH will provide the relevant technical requirements and
designated connection points for the supplied equipment. Any different
scope can be reviewed and agreed separately during the quotation stage.
19. Additional Requirements
Step 03
Sandblasting Booth Requirements
Maximum Workpiece Dimensions
Available Installation Space
Abrasive Collection & Recovery
For recessed pit / hopper recovery systems, ColoX Industrie GmbH can provide
the required technical dimensions and interface requirements. Civil works,
excavation and concrete works are normally arranged by the customer unless
otherwise specifically agreed in the quotation.
Step 03
Retractable Paint Booth Requirements
Maximum Workpiece Dimensions
Required Extended Working Dimensions
Available Installation Space
Heating / Temperature Control
Maximum operating temperature for the retractable booth is 50°C.
The heating system may be used to maintain a suitable working temperature
for operators, support consistent painting conditions and assist paint
drying up to the maximum permitted temperature.
Step 03
Complete Industrial Coating Project
Maximum Workpiece Dimensions
Available Factory Area